Gitakshmi Technologies

The Risk-Free Guide to Migrating from SAP ECC to S/4HANA with Gitakshmi

For over a decade, SAP ECC has been the trusted engine for global businesses. However, with SAP officially announcing the end of mainstream maintenance for ECC in 2027, business leaders face a critical decision. Continuing with legacy ECC systems is a business risk.

⚠️ Security Vulnerabilities Without regular patches, your data becomes a target for cyber threats.
⚠️ Compliance Gaps Regulatory changes in tax and legal frameworks will no longer be automatically updated.
⚠️ Operational Cost Maintaining outdated hardware and paying for "Extended Support" is significantly more expensive.
2

Gitakshmi’s 4-Step Roadmap to S/4HANA

A successful migration requires precision. We follow a rigorous 4-step framework to ensure Zero Data Loss.

Phase 1: Discovery & Readiness

We analyze your current system (landscape analysis) to understand hardware sizing, custom code compatibility, and business process dependencies.

Phase 2: Intelligent Data Classification

Migrating 100% of your data is unnecessary and costly. We help you categorize data:

Data TypeDefinitionAction Strategy
🔥 Hot DataCritical for daily opsMigrate to Memory
🌤️ Warm DataNeeded for reportingStandard Storage
❄️ Cold DataCompliance archivesArchive (Do Not Migrate)
Phase 3: Data Cleansing

Using advanced tools, we identify duplicates, fix formatting errors, and standardize data before it enters the new system.

Phase 4: Execution & Cutover

We execute with a clear "Rollback Strategy" ensuring your business operations are safe even in worst-case scenarios.

3

ROI Analysis: Turning Cost into Investment

Many CFOs ask: "Why spend on migration?" The answer is ROI. S/4HANA is a new architecture.

Feature Old World (SAP ECC) New World (SAP S/4HANA)
Database Traditional (Disk-based, Slow) SAP HANA (In-Memory, Real-time)
Processing Batch Jobs (Wait overnight) Live Insights (Instant decision making)
User Interface Complex Screens (GUI) Modern Fiori Apps (Mobile Ready)
Innovation Stagnant Built-in AI & Machine Learning
4

Essential Prerequisites Before You Start

  • Unicode Compliance: Your ECC system must support Unicode to handle global character sets.
  • Database Migration: You must move from legacy databases (Oracle/SQL) to SAP HANA.
  • Custom Code Adaptation: Critical. Old Z-codes must be refactored to align with new standards.
5

Solving the Talent Crunch: Implementation + Staffing

The #1 reason projects fail is lack of talent. Stop Juggling Vendors. We offer a 360° Migration Model:

Challenge Traditional Multi-Vendor The Gitakshmi 360° Advantage
Project Management Fragmented between vendors. Single Point of Ownership.
Staffing Speed Weeks to hire a freelancer. Instant deployment of certified experts.
Accountability Blame game on delays. End-to-End Responsibility.
6

Choosing Your Path

There is no "one size fits all." We help you select the strategy.

Greenfield
New Implementation

Concept: Building a new house from scratch.

Best For: Complex legacy systems; wanting to re-engineer processes.

Brownfield
System Conversion

Concept: Renovating an existing house.

Best For: Clean data; preserving existing workflows.

Hybrid
Selective Data

Concept: A mix of both.

Best For: Large enterprises needing specific historical data.

7

The Technical Execution Checklist

  • Maintenance Planner: Checks system requirements and download compatibility stacks.
  • Simplification Item Check: Identifies functionalities in ECC that have changed in S/4HANA.
  • SUM (Software Upgrade Manager): The core tool for database migration and software conversion.
  • Testing Phase: Functional, Performance, and UAT before the final Go-Live.
8

Beyond Go-Live: Ensuring Long-Term Success

Migration is just the beginning. Once you are live, Gitakshmi ensures stability through:

🔄 Quarterly Innovation
👥 Continuous Staffing

Ready to Future-Proof Your Business?

Don't wait until 2027. Start your risk-free assessment today.

Contact Gitakshmi Technologies 👉

Table of Contents

All Categories

Download PDF

    Scroll to Top